製品説明
会社概要
The company’s main products include desulfurization, dehydrocarbons, separation, compression, filling, storage and transportation equipment for natural gas extraction in oil and gas fields; complete sets of wellhead gas recovery equipment; complete sets of vented natural gas recovery equipment; complete sets of coalbed methane, shale gas and biogas development and utilization equipment Equipment; CNG filling station complete equipment; LNG complete equipment; BOG compressor; large-displacement screw-piston compound compressor; membrane nitrogen and adsorption nitrogen production complete equipment; in addition, hydrogen, oxygen, nitrogen, argon, carbon monoxide gas, carbon dioxide gas, coal gas, hydrogen sulfide gas, propylene gas, ethylene gas, methyl chloride gas, trifluoropropane gas, liquefied petroleum gas and other special gases, low-temperature gases and air compressors. Among them, the W and V series non-lubricated compressors produced by introducing advanced foreign technology have reached the international advanced level.
製品説明
The company currently has 10 series of leading products and hundreds of specifications. Its volumetric flow rate: 0.05~200m3/min. Pressure range: low pressure type 0~1.6MPa, medium pressure
Type 1.6~8.0MPa, high pressure type 8.0~50.0MPa. Lubrication methods are divided into 3 types: oil, oil-free and completely oil-free. The structural types include Z, W, V, D, M and H types. There are 3 cooling methods: air cooling, water cooling, and mixed cooling. In addition to providing users with customized products, we can also carry out personalized design and manufacturing according to user needs.
CNG STHangZhouRD STATION COMPRESSOR
CNG standard stations are built where natural gas pipelines pass through.
Gas is taken directly from the natural gas pipeline. Natural gas undergoes desulfurization, pressure regulation, metering, and
Filtration, dehydration and other processes enter the compressor unit, and then compress, cool and purify
Then the pressure is increased to 25Mpa, and finally the high-pressure trailer is supplied to the high-pressure trailer through the air filling column.
Fill up the gas, and also fill up the car through the gas vending machine. Our company can provide overall
Solutions and turnkey projects.
Equipment composition: air inlet filter pressure regulating metering device, desulfurization tower, low-pressure dehydration device, piston compressor, sequence control panel, gas storage bottle group, adding
Gas machines, gas filling columns, CNG trailers, gas alarm devices and other equipment.
Covered area: about 2000~4000m²
Optimal transportation radius: 150km
Suitable scale: ≥40000Nm²/d
Equipment installation time: about 30 days.
| いいえ。 | TYPE | 吸気圧 MPa |
CAPACITY Nm3/h |
MOTOR キロワット |
COOLING | WEIGHT(TONS) | SIZE mm |
|||||
| 1 | W-5.6/0.5-250 | 0.05 | 500 | 160 | WATER COOLING | 9 | 5000×2300×2200 | |||||
| 2 | W-3.6/1-250 | 0.1 | 435 | 110 | WATER/MIX COOLING | 6 | 2400×2220×2150 | |||||
| 3 | W-4.75/1-250 | 0.1 | 570 | 132 | WATER/MIX COOLING | 6 | 2400×2220×2150 | |||||
| 4 | W-7.5/1-250 | 0.1 | 900 | 270 | WATER/MIX COOLING | 17 | 8500×2260×2200 | |||||
| 5 | W-4.5/1.4-250 | 0.14 | 650 | 160 | WATER/MIX COOLING | 7 | 3820×2270×2150 | |||||
| 6 | W-4.7/2-250 | 0.2 | 850 | 185 | WATER/MIX COOLING | 7 | 3820×2270×2150 | |||||
| 7 | WF-3.6/(1.5~2.5)-250 0.15~0.25 | 0.15~0.25 | 540~750 | 160 | AIR COOLING | 14 | 6200×2190×2080 | |||||
| 8 | W-3.6/(1.5~3)-250 | 0.15~0.3 | 540~860 | 185 | WATER/MIX COOLING | 7 | 4000×2270×2150 | |||||
| 9 | V-3.2/(3-5)-250 | 0.3~0.5 | 760-1150 | 220 | AIR COOLING | 14 | 6300×2525×2500 | |||||
| 10 | VF-3.2/(3~5)-250 | 0.3~0.5 | 770~1150 | 220 | WATER/MIX COOLING | 14 | 6300×2500×2500 | |||||
| 11 | W-1.5/8-250 | 0.8 | 810 | 132 | WATER/MIX COOLING | 8 | 4000×2300×2000 | |||||
| 12 | VF-2/(10~16)-250 | 1.0~1.6 | 1320~2000 | 280 | AIR COOLING | 10 | 5600×2500×2300 | |||||
| 13 | D-5/(2~4)-250 | 0.2~0.4 | 900~1500 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | |||||
| 14 | D-4.2/(3~6)-250 | 0.3~0.6 | 1000-1760 | 280 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | |||||
| 15 | D-3.6/(4~7)-250 | 0.4~0.7 | 1050~1730 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | |||||
| 16 | D-2.6/(7~12)-250 | 0.7~1.2 | 1250~2000 | 280 | WATER/AIR/MIX COOLING | 20 | 5000×3500×2500 | |||||
| 17 | VF-0.76/(7~13)-250 | 0.7~1.3 | 365~640 | 100 | WATER/AIR/MIX COOLING | 8 | 6000×2200×2230 | |||||
CNG MOTHER STATION COMPRESSOR
The CNG mother station is built in a place where natural gas pipelines pass through.
Take the gas directly from the gas pipeline. Natural gas undergoes desulfurization, pressure regulation, metering, filtration,
Dehydration and other processes enter the compressor unit, and then are compressed, cooled and purified to make it
The pressure is increased to 25Mpa, and finally the high-pressure trailer is filled with air through the air filling column.
Sometimes, cars can also be refueled through gas vending machines. Our company provides turnkey projects.
Equipment composition: air inlet filter pressure regulating metering device, desulfurization tower, low pressure desulfurization tower
Water device, piston compressor, sequence control panel, gas storage bottle group, gas filling
machine, gas filling column, CNG trailer, gas alarm device and other equipment.
Covered area: about 2000~4000m²
Optimal transportation radius: 150km
Suitable scale: ≥40000Nm²/d
Equipment installation time: about 30 days.
| いいえ。 | TYPE | 吸気圧 MPa |
CAPACITY Nm3/h |
MOTOR キロワット |
COOLING | WEIGHT(TONS) | SIZE mm |
||||
| 1 | D-5/(2-4)-250 | 0.2~0.4 | 900~1500 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 2 | VF-3.2/(3~5)-250 | 0.3~0.5 | 770~1150 | 220 | AIR COOLING | 14 | 6300×2500×2500 | ||||
| 3 | D-4.2/(3-6)-250 | 03~0.6 | 1000-1760 | 280 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 4 | D-3.6/(4~7)-250 | 0.4~0.7 | 1050~1730 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 5 | D-2.6/(7~12)-250 | 0.7~1.2 | 1250~2000 | 280 | WATER/MIX COOLING | 20 | 5000×3500×2500 | ||||
| 6 | VF-0.76/(7~13)-250 | 0.7~0.3 | 365~640 | 100 | MIX COOLING | 8 | 6000×2200×2230 | ||||
| 7 | D-2.8/(8-12)-250 | 0.8~1.2 | 1350-2150 | 280 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 8 | V-2/(9-14)-250 | 0.9~1.4 | 1200-1800 | 280 | WATER/AIR/MIX COOLING | 12 | 6500×2525×2300 | ||||
| 9 | VFD-2/14-210 | 1.4 | 1800 | 280 | AIR COOLING | 15 | 10000×4000×3000 | ||||
| 10 | D-2.5/(12-14)-250 | 1.2~1.4 | 1950-2250 | 18 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 11 | VF-2/(10~16)-250 | 1.0~1.6 | 1320~2000 | 280 | AIR COOLING | 10 | 5600×2500×2300 | ||||
| 12 | D-2.8/(10~16)-250 | 1.0~1.6 | 1800-2850 | 355 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 13 | V-1.43/(16~20)-250 | 1.6~2.0 | 1460~1800 | 220 | WATER/AIR/MIX COOLING | 11 | 6000×2500×2250 | ||||
| 14 | D-2.4/(16-20)-250 | 1.6~2.0 | 2450-3000 | 355 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 15 | D-2.4/(16-23)-210 | 1.6~2.3 | 2450-3450 | 355 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 16 | V-1.8/(18-23)-210 | 1.8~2.3 | 2000-2590 | 280 | WATER/AIR/MIX COOLING | 12 | 6500×2525×2200 | ||||
| 17 | D-1.45/(20-35)-250 | 2.0~3.5 | 1830-3100 | 280 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2500 | ||||
| 18 | V-0.8/(19~35)-250 | 1.9~3.5 | 960~1720 | 160 | WATER/AIR/MIX COOLING | 13 | 6500×2525×2200 | ||||
| 19 | VF-1/(25~40)-250 | 2.5~4.0 | 1560~2700 | 220 | AIR COOLING | 13.5 | 4250×2525×2100 | ||||
| 20 | D-1.45/(40~60)-250 | 4.0~6.0 | 3600~5300 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2100 | ||||
| 21 | D-1.3/(50-70)-250 | 5.0~7.0 | 3970~5530 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2100 | ||||
| 22 | D-1.3/(60-70)-250 | 6.0~7.0 | 4758~5530 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2100 | ||||
| 23 | D-1.2/(40-80)-250 | 4.0~8.0 | 4758~5530 | 315 | WATER/AIR/MIX COOLING | 23 | 5000×3500×2100 | ||||
| 24 | D-3.5/(7-10)-250 | 0.7~1 | 1680~2240 | 550 | AIR COOLING | 28 | 6600×4300×2500 | ||||
CNG SUBSTATION COMPRESSOR
CNG substations are built in places where no natural gas pipelines pass through.
The CNG trailer transfers the gas from the mother station to the station and unloads the gas through the gas unloading column.
Gas machines refill cars.
Equipment composition: gas unloading column, sub-station compressor, sequence control panel, storage
Gas cylinder sets, gas dispensers, gas alarm devices, CNG trailers and other equipment.
Covered area: about 1000~1500m²
Way of working:
After natural balance, the direct intake air is compressed and supercharged, and the average working capacity is
More than 1000 square meters
Compressor exhaust volume changes range as trailer pressure drops:
1800-400Nm²/h
| いいえ。 | TYPE | 吸気圧 MPa |
CAPACITY Nm3/h |
MOTOR キロワット |
COOLING | WEIGHT(TONS) | SIZE mm |
||||
| 1 | VF-0.32/(30~200)-250 | 3~20 | 1500 | 75 | AIR | 5.5 | 5538×2134×1680 | ||||
| 2 | VFD-0.32/(30~200)-250 | 3~20 | 1500 | 75 | AIR | 9.65 | 5538×2438×2438 | ||||
| 3 | DFD-0.32/(30-200)-250 | 3~20 | 1500 | 75 | AIR | 8.5 | 4400×2610×2591 | ||||
| 4 | VFD-0.32/(20~200)-250 | 2~20 | 1500 | 75 | AIR | 9.65 | 5538×2438×2438 | ||||
| 5 | VF-0.26/(30-200)-250 | 3~20 | 1000 | 55 | AIR | 5.5 | 5538×2350×2000 | ||||
| 6 | VFD-0.26/(30-200)-250 | 3~20 | 1000 | 55 | AIR | 9.5 | 5538×2350×2438 | ||||
| 7 | ZFD-0.1/(30~200)-250 | 3~20 | 650 | 37 | AIR | 8.5 | 7000×2700×2700 | ||||
| 8 | ZFD-0.24/(30-200)-250 | 3~20 | 1400 | 37×2 | AIR | 8.5 | 7000×2700×2700 | ||||
| 9 | KR-1500/(20-200)-250 | 2~20 | 1500 | 30×2 | AIR | 10 | 5500×2500×2950 | ||||
| 10 | KR-2000/(20-200)-250 | 2~20 | 2000 | 37×2 | AIR | 10 | 5500×2500×2950 | ||||
| 11 | DFD-3[0.28]/(2-4)[25-200]-250 | 0.2~0.4
2.5~20 |
540-900 (STANARD STATION AND SUBSTATION) 1300 |
160
75 |
AIR | 12.5 | 4050×3450×2100 | ||||
詳細写真
アフターサービス
In addition to the high-quality performance of our products, we also attach great importance to providing customers with comprehensive services. We have an independent service operation and maintenance team, providing customers with various support and services, including technical support, debugging services, spare parts supply, renovation and upgrading, and major maintenance. We always adhere to the principle of customer-centrism, ensuring the safe and stable operation of customer equipment. Our service team is committed to providing reliable support for customers’ operations 24/7.
Training plan
Technical training is divided into 2 parts: company training and on-site training.
1)Company training
Before the unit is delivered, that is during the unit assembly period, users will be provided with a one-week on-site training by the company. Provide local accommodation and transportation facilities, and provide free venues, teaching materials, equipment, tools, etc. required for training. The company training content is as follows:
The working principle, structure and technical performance of the unit.
Unit assembly and adjustment, unit testing.
Operation of the unit, remote/local operation, manual/automatic operation, daily operation and management, familiar with the structure of each system of the unit.
Routine maintenance and upkeep of the unit, and precautions for operation and maintenance.
Analysis and troubleshooting of common faults, and emergency handling methods.
2) On-site training
During the installation and trial operation of the unit, on-site training will be conducted to teach the principles, structure, operation, maintenance, troubleshooting of common faults and other knowledge of the unit, so as to further become familiar with the various systems of the unit, so that the purchaser can independently and correctly operate the unit. Operation, maintenance and management.
梱包と配送
/* 2571 年 1 月 22 日 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1
| アフターサービス: | 12 Month |
|---|---|
| 保証: | 12 Month |
| 潤滑方式: | 潤滑済み |
.shipping-cost-tm .tm-status-off{background: none;padding:0;color: #1470cc}
|
送料:
単位当たりの推定運賃。 |
送料と配達予定日について。 |
|---|
| 支払方法: |
|
|---|---|
|
初回支払い 全額支払い |
| 通貨: | US$ |
|---|
| 返品・返金: | 商品到着後30日以内であれば、返金を申請できます。 |
|---|
.webp)
ガス式空気圧縮機のメンテナンス方法を教えてください。
ガス式空気圧縮機の最適な性能、長寿命、安全な運転を確保するには、メンテナンスが不可欠です。定期的なメンテナンスは、故障を防ぎ、圧縮機の寿命を延ばし、効率的な運転を促進します。以下に、ガス式空気圧縮機の主なメンテナンス手順を示します。
1. マニュアルをお読みください。
メンテナンス作業を行う前に、お使いのガス式空気圧縮機の機種専用の取扱説明書をよくお読みください。取扱説明書には、推奨されるメンテナンス間隔や具体的なメンテナンス要件など、メンテナンス手順に関する重要な指示やガイドラインが記載されています。
2. オイルの点検と交換:
ガス式空気圧縮機は、適切な潤滑を維持し、過度の摩耗を防ぐために、定期的なオイル交換が必要です。オイルレベルを定期的に確認し、メーカーの推奨に従って交換してください。ご使用の圧縮機モデルに適した推奨グレードのオイルを使用してください。
3.エアフィルターの点検と交換:
エアフィルターは定期的に点検し、必要に応じて清掃または交換してください。エアフィルターは、ほこり、ゴミ、汚染物質がコンプレッサーの内部部品に侵入するのを防ぎます。フィルターが詰まったり汚れたりすると、空気の流れが制限され、性能が低下する可能性があります。フィルターの清掃または交換については、製造元の指示に従ってください。
4. タンクから水分を排出する:
ガス式空気圧縮機は圧縮空気中に水分を蓄積し、タンクや内部部品の腐食や損傷の原因となります。過剰な水分蓄積を防ぐため、タンク内の水分を定期的に排出してください。適切な水分排出方法については、取扱説明書を参照してください。
5.接続部を確認し、締め付ける:
すべての接続部、継手、ホースに漏れや緩みがないか定期的に点検してください。緩んでいる継手は締め付け、損傷したホースやコネクタは修理または交換してください。漏れは性能低下や効率低下の原因となります。
6.ベルトとプーリーを点検する:
お使いのガス式エアコンプレッサーにベルトとプーリーが使用されている場合は、摩耗、張力、および適切な位置合わせを確認してください。摩耗または損傷したベルトは交換し、最適な性能を維持するために適切な張力を確保してください。
7. 外装と冷却フィンを清掃する:
ガス式エアコンプレッサーの外側は、汚れ、ほこり、ゴミなどが付着しないよう清潔に保ってください。柔らかい布やブラシを使って表面を清掃してください。また、冷却フィンも定期的に清掃し、空気の流れを妨げて過熱の原因となるゴミを取り除いてください。
8.専門業者による点検整備の予約をする:
定期的なメンテナンスはユーザー自身で行うこともできますが、推奨される間隔で専門業者による点検を受けることも重要です。専門技術者は、徹底的な点検、より複雑なメンテナンス作業の実施、そして注意が必要な潜在的な問題の特定を行うことができます。
9.安全上の注意事項を守ってください。
ガス式空気圧縮機のメンテナンス作業を行う際は、必ず取扱説明書に記載されている安全上の注意事項に従ってください。これには、保護具の着用、電源の遮断、密閉空間での適切な換気の確保などが含まれます。
これらのメンテナンス手順に従い、製造元のガイドラインを遵守することで、ガス式空気圧縮機を最適な状態に保ち、寿命を延ばし、安全かつ効率的な運転を確保することができます。
.webp)
高度がガス式空気圧縮機の性能に及ぼす影響とは?
高度はガス式空気圧縮機の性能に大きな影響を与える可能性があります。以下に詳細な説明を示します。
1. 空気密度の低下:
高度が上がると、空気密度は低下します。この空気密度の低下は、ガス式空気圧縮機の性能に影響を与えます。これは主に、圧縮機が周囲の空気を取り込んで圧縮空気を生成するためです。高度が高くなるにつれて空気密度が低下するため、圧縮機が十分な量の空気を吸い込む能力が低下します。
2. コンプレッサー出力の低下:
空気密度の低下は、コンプレッサーの出力に直接影響を与えます。ガス式空気圧縮機は、高地では最大風量と最大圧力が低下する可能性があります。この出力低下は、コンプレッサーの効率や、様々な用途に必要な圧縮空気を供給する能力に影響を与える可能性があります。
3. コンプレッサーの負荷増加:
高地では、ガス式空気圧縮機は、所望の圧縮空気出力レベルを維持するために、より多くの負荷がかかります。空気密度が低下するため、圧縮機は低地と同じ圧力を得るために、より多くの空気を圧縮しなければなりません。この負荷の増加は、エネルギー消費量の増加、圧縮機部品の摩耗の増加、そして最終的には性能と寿命の低下につながる可能性があります。
4. エンジン出力低下:
ガス式空気圧縮機が内燃機関(ガソリンエンジンやディーゼルエンジンなど)で駆動されている場合、高度はエンジンの性能にも影響を与える可能性があります。空気密度が低下すると、燃焼に必要な酸素量が減少するため、エンジンの出力が低下することがあります。その結果、エンジンの馬力とトルクが低下し、圧縮空気の生成能力に影響が出る可能性があります。
5.適切なサイズ選びのための考慮事項:
高地で使用するガス式空気圧縮機を選定する際には、標高条件を考慮し、それに応じて圧縮機のサイズと容量を調整することが非常に重要です。海抜での必要値よりも高い風量と圧力定格を持つ圧縮機を選択することで、高地での性能低下を補うことができます。
6. メンテナンスと調整:
高地で稼働するガス式空気圧縮機の性能を最適化するには、定期的なメンテナンスと調整が必要です。これには、空気密度の低下に対応し、適切な燃焼効率を維持するために、圧縮機の吸気システム、燃料対空気比、点火時期を監視および調整することが含まれます。
要約すると、高度はガス式空気圧縮機の性能に顕著な影響を与えます。高高度では空気密度が低下するため、圧縮機の出力低下、負荷増加、エンジン出力損失の可能性、そして適切なサイズ選定とメンテナンスに関する検討が必要となります。これらの影響を理解することは、様々な高度条件下でガス式空気圧縮機を効果的に選定・運用するために不可欠です。
.webp)
ガス式空気圧縮機は、どのような業界で一般的に使用されていますか?
ガス式空気圧縮機は、工具、機器、システムを駆動するために圧縮空気が必要な様々な産業で利用されています。これらの圧縮機は、携帯性、汎用性、高圧空気供給能力が高く評価されています。以下に、ガス式空気圧縮機が一般的に使用されている産業について詳しく説明します。
1. 建設業界:
建設業界では、さまざまな作業にガス式空気圧縮機が広く利用されています。圧縮空気は、削岩機、釘打ち機、インパクトレンチ、コンクリートブレーカーなどの空気圧工具の動力源として使用されます。ガス式空気圧縮機は、これらの工具を効率的に作動させるために必要な空気流量と圧力を供給するため、建設現場に最適です。
2. 鉱業:
鉱業において、ガス式空気圧縮機は様々な作業で重要な役割を果たしています。圧縮空気は、掘削、岩盤爆破、採掘などの作業に使用される空気圧工具の動力源として用いられます。また、鉱山内の換気システム、搬送システム、空気圧制御装置にも使用されています。ガス式空気圧縮機は、その耐久性と、過酷な環境や遠隔地の鉱山でも稼働できる能力が高く評価されています。
3. 石油・ガス産業:
石油・ガス産業では、ガス空気圧縮機が様々な用途で利用されています。これらは、油井掘削作業、空気圧工具の動力源、石油・ガスパイプラインの圧力維持などに用いられています。また、天然ガス処理プラント、製油所、石油化学プラントなどでも、様々な空気圧プロセスや機器にガス空気圧縮機が活用されています。
4. 製造業および工業部門:
製造業や産業分野では、ガス式空気圧縮機が様々な用途で広く使用されています。空気圧式ドリル、サンダー、グラインダー、スプレーガンなどの空気圧工具に圧縮空気を供給するほか、材料搬送、組立ライン作業、空気圧制御システムといった製造工程でも圧縮空気が利用されています。
5. 自動車産業:
自動車産業では、さまざまな用途にガス式空気圧縮機が利用されています。自動車組立工場では、圧縮空気は空気圧工具、塗装ブース、空気圧制御システムなどに使用されています。また、自動車修理工場では、空気圧工具の動力源、タイヤの空気充填、空気圧リフトの操作などにガス式空気圧縮機が使用されています。
6. 農業と畜産:
ガス式空気圧縮機は、農業分野で幅広く利用されています。作物の灌漑用空気圧工具の動力源、空気圧式播種機やプランターの操作、農作業における圧縮空気の供給など、様々な用途に用いられています。特に、電力供給が容易に得られない農業現場では、携帯型ガス式空気圧縮機が非常に役立ちます。
7. 食品・飲料業界:
食品・飲料業界では、ガス式空気圧縮機は様々な空気圧プロセスや機器に利用されています。食品包装作業、原材料や完成品の空気圧搬送システム、空気圧を利用した混合・ブレンド工程などに使用されています。この業界で使用されるガス式空気圧縮機は、厳格な衛生基準と安全基準を満たすように設計されています。
8. 医薬品・医療分野:
製薬・医療分野では、重要な用途にガス式空気圧縮機が使用されています。圧縮空気は、医療機器、歯科機器、実験器具、医薬品製造工程などで用いられます。この業界で使用されるガス式空気圧縮機は、厳格な品質基準を遵守し、空気の純度を維持する必要があります。
これらは、ガス式空気圧縮機を一般的に使用する産業のほんの一例です。発電、航空宇宙、海洋、化学工業などの他の分野も、特定の用途でガス式空気圧縮機に依存しています。ガス式空気圧縮機の汎用性と信頼性は、圧縮空気が不可欠な資源である多くの産業において、ガス式空気圧縮機を欠かせないものにしています。


editor by CX 2024-03-03
