压缩空气工程

China high quality Air-Cooled 250bar CH4 Methane Piston Natural Gas Booster Compressor for CNG Station arb air compressor

Product Description Company Profile   The company’s main products include desulfurization, dehydrocarbons, separation, compression, filling, storage and transportation equipment for natural gas extraction in oil and gas fields; complete sets of wellhead gas recovery equipment; complete sets of vented natural gas recovery equipment; complete sets of coalbed methane, shale gas and biogas development and utilization […]

1 月 8, 2024工程与选型指南

产品描述

公司简介

 

The company’s main products include desulfurization, dehydrocarbons, separation, compression, filling, storage and transportation equipment for natural gas extraction in oil and gas fields; complete sets of wellhead gas recovery equipment; complete sets of vented natural gas recovery equipment; complete sets of coalbed methane, shale gas and biogas development and utilization equipment Equipment; CNG filling station complete equipment; LNG complete equipment; BOG compressor; large-displacement screw-piston compound compressor; membrane nitrogen and adsorption nitrogen production complete equipment; in addition, hydrogen, oxygen, nitrogen, argon, carbon monoxide gas, carbon dioxide gas, coal gas, hydrogen sulfide gas, propylene gas, ethylene gas, methyl chloride gas, trifluoropropane gas, liquefied petroleum gas and other special gases, low-temperature gases and air compressors. Among them, the W and V series non-lubricated compressors produced by introducing advanced foreign technology have reached the international advanced level.

 

产品描述

The company currently has 10 series of leading products and hundreds of specifications. Its volumetric flow rate: 0.05~200m3/min. Pressure range: low pressure type 0~1.6MPa, medium pressure
Type 1.6~8.0MPa, high pressure type 8.0~50.0MPa. Lubrication methods are divided into 3 types: oil, oil-free and completely oil-free. The structural types include Z, W, V, D, M and H types. There are 3 cooling methods: air cooling, water cooling, and mixed cooling. In addition to providing users with customized products, we can also carry out personalized design and manufacturing according to user needs.
CNG STHangZhouRD STATION COMPRESSOR
CNG standard stations are built where natural gas pipelines pass through.
Gas is taken directly from the natural gas pipeline. Natural gas undergoes desulfurization, pressure regulation, metering, and
Filtration, dehydration and other processes enter the compressor unit, and then compress, cool and purify
Then the pressure is increased to 25Mpa, and finally the high-pressure trailer is supplied to the high-pressure trailer through the air filling column.
Fill up the gas, and also fill up the car through the gas vending machine. Our company can provide overall
Solutions and turnkey projects.
Equipment composition: air inlet filter pressure regulating metering device, desulfurization tower, low-pressure dehydration device, piston compressor, sequence control panel, gas storage bottle group, adding
Gas machines, gas filling columns, CNG trailers, gas alarm devices and other equipment.
Covered area: about 2000~4000m²
Optimal transportation radius: 150km
Suitable scale: ≥40000Nm²/d
Equipment installation time: about 30 days.
 

不。 TYPE 进气压力
兆帕
CAPACITY
立方米/小时
MOTOR
柯威
COOLING  WEIGHT(TONS) SIZE
毫米
1 W-5.6/0.5-250 0.05 500 160 WATER COOLING 9 5000×2300×2200
2 W-3.6/1-250 0.1 435 110 WATER/MIX COOLING 6 2400×2220×2150
3 W-4.75/1-250 0.1 570 132 WATER/MIX COOLING 6 2400×2220×2150
4 W-7.5/1-250 0.1 900 270 WATER/MIX COOLING 17 8500×2260×2200
5 W-4.5/1.4-250 0.14 650 160 WATER/MIX COOLING 7 3820×2270×2150
6 W-4.7/2-250 0.2 850 185 WATER/MIX COOLING 7 3820×2270×2150
7 WF-3.6/(1.5~2.5)-250  0.15~0.25 0.15~0.25 540~750 160 AIR COOLING 14 6200×2190×2080
8 W-3.6/(1.5~3)-250 0.15~0.3 540~860 185 WATER/MIX COOLING 7 4000×2270×2150
9 V-3.2/(3-5)-250 0.3~0.5 760-1150 220 AIR COOLING 14 6300×2525×2500
10 VF-3.2/(3~5)-250 0.3~0.5 770~1150 220 WATER/MIX COOLING 14 6300×2500×2500
11 W-1.5/8-250 0.8 810 132 WATER/MIX COOLING 8 4000×2300×2000
12 VF-2/(10~16)-250 1.0~1.6 1320~2000 280 AIR COOLING 10 5600×2500×2300
13 D-5/(2~4)-250 0.2~0.4 900~1500 315 WATER/AIR/MIX COOLING 23 5000×3500×2500
14 D-4.2/(3~6)-250 0.3~0.6 1000-1760 280 WATER/AIR/MIX COOLING 23 5000×3500×2500
15 D-3.6/(4~7)-250 0.4~0.7 1050~1730 315 WATER/AIR/MIX COOLING 23 5000×3500×2500
16 D-2.6/(7~12)-250 0.7~1.2 1250~2000 280 WATER/AIR/MIX COOLING 20 5000×3500×2500
17 VF-0.76/(7~13)-250 0.7~1.3 365~640 100 WATER/AIR/MIX COOLING 8 6000×2200×2230

CNG MOTHER STATION COMPRESSOR
The CNG mother station is built in a place where natural gas pipelines pass through.
Take the gas directly from the gas pipeline. Natural gas undergoes desulfurization, pressure regulation, metering, filtration,
Dehydration and other processes enter the compressor unit, and then are compressed, cooled and purified to make it
The pressure is increased to 25Mpa, and finally the high-pressure trailer is filled with air through the air filling column.
Sometimes, cars can also be refueled through gas vending machines. Our company provides turnkey projects.
Equipment composition: air inlet filter pressure regulating metering device, desulfurization tower, low pressure desulfurization tower
Water device, piston compressor, sequence control panel, gas storage bottle group, gas filling
machine, gas filling column, CNG trailer, gas alarm device and other equipment.
Covered area: about 2000~4000m²
Optimal transportation radius: 150km
Suitable scale: ≥40000Nm²/d
Equipment installation time: about 30 days.

不。 TYPE 进气压力
兆帕
CAPACITY
立方米/小时
MOTOR
柯威
COOLING  WEIGHT(TONS) SIZE
毫米
1   D-5/(2-4)-250 0.2~0.4 900~1500 315 WATER/AIR/MIX COOLING 23 5000×3500×2500
2   VF-3.2/(3~5)-250 0.3~0.5 770~1150 220 AIR COOLING 14 6300×2500×2500
3   D-4.2/(3-6)-250 03~0.6 1000-1760 280 WATER/AIR/MIX COOLING 23 5000×3500×2500
4   D-3.6/(4~7)-250 0.4~0.7 1050~1730 315 WATER/AIR/MIX COOLING 23 5000×3500×2500
5   D-2.6/(7~12)-250 0.7~1.2 1250~2000 280 WATER/MIX COOLING 20 5000×3500×2500
6   VF-0.76/(7~13)-250 0.7~0.3 365~640 100 MIX COOLING 8 6000×2200×2230
7   D-2.8/(8-12)-250 0.8~1.2 1350-2150 280 WATER/AIR/MIX COOLING 23 5000×3500×2500
8   V-2/(9-14)-250 0.9~1.4 1200-1800 280 WATER/AIR/MIX COOLING 12 6500×2525×2300
9   VFD-2/14-210 1.4 1800 280 AIR COOLING 15 10000×4000×3000
10   D-2.5/(12-14)-250 1.2~1.4 1950-2250 18 WATER/AIR/MIX COOLING 23 5000×3500×2500
11   VF-2/(10~16)-250 1.0~1.6 1320~2000 280 AIR COOLING 10 5600×2500×2300
12   D-2.8/(10~16)-250 1.0~1.6 1800-2850 355 WATER/AIR/MIX COOLING 23 5000×3500×2500
13   V-1.43/(16~20)-250 1.6~2.0 1460~1800 220 WATER/AIR/MIX COOLING 11 6000×2500×2250
14   D-2.4/(16-20)-250 1.6~2.0 2450-3000 355 WATER/AIR/MIX COOLING 23 5000×3500×2500
15   D-2.4/(16-23)-210 1.6~2.3 2450-3450 355 WATER/AIR/MIX COOLING 23 5000×3500×2500
16   V-1.8/(18-23)-210 1.8~2.3 2000-2590 280 WATER/AIR/MIX COOLING 12 6500×2525×2200
17   D-1.45/(20-35)-250 2.0~3.5 1830-3100 280 WATER/AIR/MIX COOLING 23 5000×3500×2500
18   V-0.8/(19~35)-250 1.9~3.5 960~1720 160 WATER/AIR/MIX COOLING 13 6500×2525×2200
19   VF-1/(25~40)-250 2.5~4.0 1560~2700 220 AIR COOLING 13.5 4250×2525×2100
20   D-1.45/(40~60)-250 4.0~6.0 3600~5300 315 WATER/AIR/MIX COOLING 23 5000×3500×2100
21   D-1.3/(50-70)-250 5.0~7.0 3970~5530 315 WATER/AIR/MIX COOLING 23 5000×3500×2100
22   D-1.3/(60-70)-250 6.0~7.0 4758~5530 315 WATER/AIR/MIX COOLING 23 5000×3500×2100
23   D-1.2/(40-80)-250 4.0~8.0 4758~5530 315 WATER/AIR/MIX COOLING 23 5000×3500×2100
24   D-3.5/(7-10)-250 0.7~1 1680~2240 550 AIR COOLING 28 6600×4300×2500

CNG SUBSTATION COMPRESSOR
CNG substations are built in places where no natural gas pipelines pass through.
The CNG trailer transfers the gas from the mother station to the station and unloads the gas through the gas unloading column.
Gas machines refill cars.
Equipment composition: gas unloading column, sub-station compressor, sequence control panel, storage
Gas cylinder sets, gas dispensers, gas alarm devices, CNG trailers and other equipment.
Covered area: about 1000~1500m²
Way of working:
After natural balance, the direct intake air is compressed and supercharged, and the average working capacity is
More than 1000 square meters
Compressor exhaust volume changes range as trailer pressure drops:
1800-400Nm²/h

不。 TYPE 进气压力
兆帕
CAPACITY
立方米/小时
MOTOR
柯威
COOLING  WEIGHT(TONS) SIZE
毫米
1 VF-0.32/(30~200)-250 3~20 1500 75 AIR 5.5 5538×2134×1680
2 VFD-0.32/(30~200)-250 3~20 1500 75 AIR 9.65 5538×2438×2438
3 DFD-0.32/(30-200)-250 3~20 1500 75 AIR 8.5 4400×2610×2591
4 VFD-0.32/(20~200)-250 2~20 1500 75 AIR 9.65 5538×2438×2438
5 VF-0.26/(30-200)-250 3~20 1000 55 AIR 5.5 5538×2350×2000
6 VFD-0.26/(30-200)-250 3~20 1000 55 AIR 9.5 5538×2350×2438
7 ZFD-0.1/(30~200)-250 3~20 650 37 AIR 8.5 7000×2700×2700
8 ZFD-0.24/(30-200)-250 3~20 1400 37×2 AIR 8.5 7000×2700×2700
9 KR-1500/(20-200)-250 2~20 1500 30×2 AIR 10 5500×2500×2950
10 KR-2000/(20-200)-250 2~20 2000 37×2 AIR 10 5500×2500×2950
11 DFD-3[0.28]/(2-4)[25-200]-250 0.2~0.4

2.5~20

540-900
(STANARD STATION AND SUBSTATION)
1300
160

75

AIR 12.5 4050×3450×2100

详细照片

 

售后服务

In addition to the high-quality performance of our products, we also attach great importance to providing customers with comprehensive services. We have an independent service operation and maintenance team, providing customers with various support and services, including technical support, debugging services, spare parts supply, renovation and upgrading, and major maintenance. We always adhere to the principle of customer-centrism, ensuring the safe and stable operation of customer equipment. Our service team is committed to providing reliable support for customers’ operations 24/7.
 

Training plan

Technical training is divided into 2 parts: company training and on-site training.
1)Company training
Before the unit is delivered, that is during the unit assembly period, users will be provided with a one-week on-site training by the company. Provide local accommodation and transportation facilities, and provide free venues, teaching materials, equipment, tools, etc. required for training. The company training content is as follows:
The working principle, structure and technical performance of the unit.
Unit assembly and adjustment, unit testing.
Operation of the unit, remote/local operation, manual/automatic operation, daily operation and management, familiar with the structure of each system of the unit.
Routine maintenance and upkeep of the unit, and precautions for operation and maintenance.
Analysis and troubleshooting of common faults, and emergency handling methods.
2) On-site training
During the installation and trial operation of the unit, on-site training will be conducted to teach the principles, structure, operation, maintenance, troubleshooting of common faults and other knowledge of the unit, so as to further become familiar with the various systems of the unit, so that the purchaser can independently and correctly operate the unit. Operation, maintenance and management.
 

包装和运输

 

  /* March 10, 2571 17:59:20 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1

售后服务: 12 个月
保修单: 12 个月
润滑方式: 润滑

.shipping-cost-tm .tm-status-off{background: none;padding:0;color: #1470cc}

运费:

每件商品预计运费。







关于运费和预计送达时间。
付款方式:







 

首付款



全额付款
货币: US$
退货和退款: 您可以在收到产品后 30 天内申请退款。

空气压缩机

燃气空气压缩机的典型使用寿命是多久?

燃气空气压缩机的典型使用寿命受多种因素影响,包括压缩机的质量、使用方式、维护保养以及环境条件。然而,只要保养得当,燃气空气压缩机可以使用多年。以下详细解释了影响燃气空气压缩机使用寿命的因素:

1. 压缩机的质量:

气体空气压缩机的质量和结构对其使用寿命起着至关重要的作用。采用优质材料、精密工程设计和坚固部件制造的压缩机通常更耐用,能够承受长时间的高强度使用。

2. 使用模式:

燃气空气压缩机的使用模式会影响其使用寿命。如果压缩机持续长时间使用,其磨损程度可能比间歇使用或用于轻型作业的压缩机更大。重载应用,例如使用高负荷工具连续运行,会给压缩机带来更大的压力,并可能缩短其使用寿命。

3. 维护措施:

定期维护对于延长燃气空气压缩机的使用寿命至关重要。遵循制造商推荐的维护计划,进行诸如更换机油、清洁/更换过滤器以及检查部件等日常维护工作,有助于预防故障并确保最佳性能。忽视维护会导致磨损加剧,甚至造成故障。

4. 环境条件:

运行环境会对气体空气压缩机的使用寿命产生显著影响。极端温度、湿度、灰尘或碎屑以及腐蚀性物质等因素都会影响压缩机的部件和整体性能。在恶劣环境下使用的压缩机可能需要额外的保护措施或专门的维护,以减轻这些不利条件的影响。

5. 正确的安装和操作:

正确安装和操作气体空气压缩机对其使用寿命至关重要。遵循制造商的安装指南,确保良好的通风,保持正确的油位,并在压缩机规定的容量和压力范围内运行,有助于防止过度负荷和过早磨损。

考虑到这些因素,一台保养良好的燃气空气压缩机通常可以使用10到15年甚至更久。但是,需要注意的是,这只是一个大致的估计,实际情况可能会有所不同。有些压缩机由于使用频繁、维护不当或其他因素,使用寿命可能会缩短;而有些压缩机如果保养得当,使用条件良好,则可能远远超过预期寿命。

最终,投资购买高质量的燃气空气压缩机,遵循推荐的维护规范,并在其预期的功能范围内使用,可以最大限度地延长其使用寿命,并确保其在较长时间内可靠运行。

空气压缩机

如何将气体空气压缩机运输到不同的施工现场?

将气体空气压缩机运输到不同的作业现场需要周密的计划和对各种因素的考虑。以下是详细说明:

1. 设备尺寸和重量:

气体空气压缩机的尺寸和重量是规划运输时需要考虑的关键因素。气体空气压缩机的尺寸和配置各不相同,从便携式到大型的撬装式或拖车式压缩机,应有尽有。评估压缩机的尺寸和重量,以确定合适的运输方式。

2. 运输方式:

根据气体空气压缩机的尺寸、重量以及与作业现场的距离,可以使用不同的运输方式进行运输:

  • 卡车或拖车: 小型燃气空气压缩机可以装载到卡车车厢或拖车上运输。请确保车辆或拖车有足够的承载能力来容纳压缩机的重量和尺寸。
  • 平板拖车或低平板拖车: 大型气体压缩机或撬装式机组可能需要用平板拖车或低平板拖车运输。这些拖车专为运输重型设备而设计,并能在运输过程中提供稳定性。
  • 集装箱: 对于长途运输或国际货运,气体空气压缩机可以装在集装箱内运输。压缩机必须在集装箱内妥善固定和保护,以防止运输过程中受到任何损坏。

3. 安全保障和保护:

运输过程中必须妥善固定气体空气压缩机,以防止移位或损坏。使用合适的捆绑带、链条或紧固件将压缩机固定在运输车辆或拖车上。使用合适的罩子、衬垫或防风雨外壳保护压缩机免受冲击、振动和恶劣天气的影响。

4. 许可证和法规:

根据气体空气压缩机的尺寸和重量,运输可能需要特殊许可证或护送人员。请熟悉当地、州和联邦关于超大或超重货物的法规,并获得必要的许可证,以确保遵守运输法律。

5. 路线规划:

仔细规划运输路线,考虑路况、高度和重量限制、桥梁、隧道以及其他潜在障碍等因素。必要时确定替代路线,并与交通管理部门或机构沟通,以确保旅途顺利安全。

6. 设备检查和维护:

运输前,务必对燃气空气压缩机进行全面检查,确保其处于正常工作状态。检查是否存在泄漏、损坏或部件松动等情况。进行日常维护,例如更换机油、滤芯和皮带检查,以最大程度地降低运输过程中设备发生故障的风险。

总之,将气体空气压缩机运输到不同的作业现场需要考虑诸多因素,例如设备尺寸和重量、选择合适的运输方式、确保压缩机的安全防护、获取必要的许可证、规划运输路线以及进行设备检查和维护。周密的计划和对运输法规的严格遵守是安全高效运输气体空气压缩机的关键。

空气压缩机

气体空气压缩机的工作原理是什么?

燃气空气压缩机的工作原理是利用燃气发动机驱动压缩泵,压缩泵吸入空气并将其压缩至更高的压力。压缩后的空气可用于各种用途。以下是燃气空气压缩机工作原理的详细说明:

1. 燃气发动机:

燃气空气压缩机以燃气发动机为动力源。燃气发动机通常使用汽油、柴油、天然气或丙烷作为燃料。发动机启动时,燃料在气缸内燃烧,产生旋转运动形式的机械能。

2. 压缩机泵:

燃气发动机通过机械连接(例如皮带或直接耦合)驱动压缩机泵。压缩机泵负责吸入大气空气并将其压缩至更高的压力。燃气空气压缩机中使用的压缩机泵类型多种多样,包括往复式、螺杆式和离心式,每种泵的工作原理各不相同。

3. 进气冲程:

在往复式压缩机中,当活塞在气缸内向下运动时,进气冲程开始。这会产生真空,使进气阀打开,大气被吸入气缸。在螺杆式或离心式压缩机中,压缩机工作时,空气会持续地通过进气口吸入。

4. 压缩冲程:

在往复式压缩机的压缩冲程中,活塞向上运动,减小气缸内的容积。这种压缩作用使空气被压缩,压力升高。在螺杆式压缩机中,两个相互啮合的螺杆旋转,将空气夹在中间并压缩。在离心式压缩机中,空气被高速旋转的叶轮加速并压缩。

5. 出院中风:

往复式压缩机中,空气压缩后,排气冲程开始。活塞向上运动,进一步减小气缸容积,并将压缩空气通过排气阀排出。在螺杆式压缩机中,随着相互啮合的螺杆持续旋转,压缩空气通过排气口排出。在离心式压缩机中,高压空气从叶轮排出到周围的蜗壳内。

6. 压力调节:

气体空气压缩机通常包含压力调节机构,用于控制压缩空气的输出压力。这可以通过压力开关、调节器或控制系统来实现,这些装置会根据所需的压力设定值来调节压缩机的运行。这些机构有助于为特定应用需求提供稳定可控的压缩空气供应。

7. 存储和应用:

气体空气压缩机产生的压缩空气通常储存在储气罐中,或直接用于各种应用。储气罐有助于稳定压力,并提供压缩空气的储备,以便立即使用。压缩空气可以从储气罐通过管道输送到气动工具、机械或其他需要压缩空气才能运行的设备。

总的来说,燃气空气压缩机的工作原理是利用燃气发动机驱动压缩泵,压缩泵吸入空气并将其压缩至更高的压力。压缩空气经过调节后可用于各种应用,为气动工具、机械和其他设备提供可靠的动力源。

China high quality Air-Cooled 250bar CH4 Methane Piston Natural Gas Booster Compressor for CNG Station   arb air compressorChina high quality Air-Cooled 250bar CH4 Methane Piston Natural Gas Booster Compressor for CNG Station   arb air compressor
editor by CX 2024-01-08